Noranda required a plan to continue operation during a major equipment repair event. DPG prepared concepts and a preliminary design for a conveyor bypass system to deliver bauxite to the Plant during repairs.
Noranda required a plan to continue operation during a major equipment repair event. DPG prepared concepts and a preliminary design for a conveyor bypass system to deliver bauxite to the Plant during repairs.
Long-range strategic project investigating options to reduce the cost of shipped bauxite. DPG evaluated expansion project concepts, costs and issues related to limestone removal and bauxite drying.
Conceptual study to prepare a conceptual design to identify and evaluate options to remove stones larger than 3” from as-mined bauxite, which is very wet and sticky, and load trains at the St. Jago station. Performed a site evaluation; evaluated alternative equipment and facility layouts; selected a preferred alternative and defined Project requirements; prepared a […]