Citgo Refinery Upgrades

Coal and Pet Coke

January 4, 2021

Project concept development for refinery coke system improvements including: – replacement coke crane – upgraded pit/pad reclaim arrangement – conveying to storage yard – dozer reclaim to new reclaim conveying equipment – truck loadout for delivery to a new barge loading station

January 31, 2020

Evaluated the existing railcar unloading system to accommodate an increase in annual throughput. Project tasks included: rotary railcar dumper inspection and condition assessment, dumper replacement cost evaluation and rapid discharge bottom dump railcar unloading evaluation. Developed dumper replacement layout drawings and mini-specifications packages to solicit quotations from rotary dumper manufacturers to replace the aging dumper […]

January 31, 2020

Developed concepts for expanding the existing coal terminal to handle a progressive increase in annual throughput. Provided phased expansion plans to expand live storage capacity using linear traveling stacking equipment to reduce the use of dozers to reduce operating costs and improve efficiencies. Planned upgrades for reclaim systems, conveyor distribution and a new ship loader […]

January 31, 2020

Developed transfer geometries and layouts for several conveyors in a high-capacity multi-cargo conveyor system. Transfers included adjustable trajectory deflectors, transfer chutes and bottom inlet belt loaders. Utilized stream flow methodology and DEM analysis to design chutes that minimize turbulence and impact within the transfer in order to minimize degradation, chute wear, spillage and dust.

January 31, 2020

Evaluation and design of conveyor transfers for multi-cargo shiploader and 2-speed conveyors. Employed stream flow methodology and DEM modeling to develop moving-wall, adjustable deflectors and transfer chutes for variable flow characteristics. Designs addressed product aeration and impact, reducing spillage and dust emissions.

January 31, 2020

Prepared an initial Basis of Design, Conceptual Design and budgetary capital costs for a new bulk materials export terminal to handle iron ore concentrate and coal at a new facility in Pittsburg, CA. Project planned as a phased development to address initial tonnage projections and growth over a multi-year period. Perpared evaluations and planning documents […]

info@douglasplanning.com
858.217-5367 linkedin
  • Services
  • Insights
  • Projects
  • About
  • Contact

Copyright 2023 © Douglas Planning Group All rights reserved. Developed By TinyFrog Technologies

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. AcceptReject
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT